Intu Braehead – Low temperature hot water system (LTHW)

/Intu Braehead – Low temperature hot water system (LTHW)
Intu Braehead – Low temperature hot water system (LTHW)2017-06-02T03:52:55+00:00

Project Description

AGM Building Services were awarded the contract to install new LTHW Flow and Return Pipework and Commercial Ductwork Systems to the new Internal shopping Units.

The program of works began in Jan 2017 and completed within the contract program approx. 4 weeks. These works will involve AGM Building Services working alongside the centres Building Consultant, Operation Teams and Main Contractor. All large scale pipework will be fabricated off site at our workshops to minimise our onsite works. This system will create an efficient program on site which allows the other disciplines to operate at the same time.

The ductwork installation has been also programmed into suit the shopping centres ongoing situation. These works will be carried out both within and out with normal working hours.